Manufacturing
Owner:
Prager
Design:
Woodward Design Group
Size:
50,000 square feet
Budget:
$6,300,000
Completion:
August, 2008
Prager Manufacturing
Construction of the new Prager Manufacturing Facility was centered around a pile-supported, 50,000 square pre-engineered metal building from Butler Manufacturing. The building houses both office and manufacturing space. Woodward worked closely with Prager and St. Charles Parish ensure that the site drainage would work with the existing limitations of the parish drainage system. Woodward completed the project one month ahead of schedule.
