Join us for a Pre-bid and DBE Outreach Meeting

5 July 2017

Join us for a Pre-bid and DBE Outreach Meeting

Woodward Design+Build will hold a pre-bid/DBE outreach meeting for the development of apartments at Julia & St. Charles. The meeting will take place on Tuesday, July 11 from 3:00pm-4:00pm at 1000 S. Jefferson Davis Pkwy (WDB Office).

PROJECT DESCRIPTION: The project consists of one building, approximately 310,500sf of 198 apartment units on 4 floors on top of a 2-level parking garage. The 2-level parking garage will be a post tensioned elevated concrete podium slab design. The first floor will consist of unfinished/unconditioned shell retail tenant spaces, fitness center, and secured parking spaces.
This is a Design Build project.

DISADVANTAGED BUSINESS ENTERPRISE REQUIRED: This project has a 35% DBE goal. This project also requires that our average daily workforce shall consist of a MINIMUM of 40% Orleans Parish residents.

TO VIEW PLANS: Please contact Lauren Marshall at lmarshall@woodwarddesignbuild.com. Attendance to the pre-bid meeting is not mandatory to submit a bid.

BID DUE DATE: Thursday, July 20 at 4:00pm CT

AVAILABLE SCOPES OF WORK:
Testing
final clean
dumpsters
survey
demolition/abatement
site excavation
utilities
storm water
pavement marking
parking controls
site improvements
site furnishings
soil treatment
fencing
landscaping
piles concrete
masonry
structural steel
misc. metals
wood framing
rough carpentry
finish carpentry
millwork
countertops
waterproofing
roofing
caulking & sealants metal wall panels
door/frames/hardware
overhead doors
glass & glazing
windows
drywall
stucco
insulation
carpet
tile
wood flooring
VCT
painting
toilet accessories
misc. specialties
signage
appliances
shades
trash chute

Building a Stronger Brand + Web Design by Line 58